Frequently Asked Questions and Links
Q. How will dust be controlled during construction?
A. The project contractor will apply water on the construction area to keep dust levels to a minimum. Feel free to call our Hotline at (541) 317-3002, ext 1 or send an email (Murphyroad_SE_INT@ch2m.com) to report excessive dust during construction.
Q. How will I know when construction will start in my area?
A. Public information meetings will be planned for neighborhoods within the construction area - look for meeting notifications in the mail. Also, check back here on our website for timeline and construction updates.
Q. Will I be required to hook up to the sewer system if I have a working septic system?
A. No. You are not required to hook up to the new sewerline. However, if your septic system fails, depending on the location of existing sewer lines, you may be required to connect sewer service to your property. The Septic System Failure guide will explain the steps and forms required for fixing a failing septic system.
Q. How do I hook up to the sewer system?
A. Learn about connecting to the sewer system in the Septic System Failure Fact Sheet--Please direct any questions you may have via the comment form.
Q. Will my street eventually have a sewerline?
A. Link to Collection System Master Plan Study Area Plans to find proposed sanitary sewer layouts for your area.
For additional details and information regarding the southeast Bend wastewater conveyance project, please refer to the following links: